EXPERIENCE IN SURVEY/INVESTIGATION, PLANNING, DESIGN & CONSTRUCTION OF POWER PROJECTS :

Experience of technocrats working with KMN varies between 25 to 35 years in project planning , survey & investigations , preparation of PFRs/DPRs, preliminary & detailed designing of various components of  Hydel Projects, Project Management during construction & operation and maintenance of Power Projects, gained due to their contributions to various prestigious projects which have been executed by state government as they were serving in H P State Electricity Board and in private sector.
The detail of these projects is indicated in Annexure.

Project in govt. sector

ANNEX.-I

S. No Name of Hydel Project Department Location State  Current Status
1. SVP Bhaba (120MW) HPSEB HP Commissioned
2. Nathpajhakri (1500 MW) NJPC HP Commissioned
3. Larji(126 MW) HPSEB HP Commissioned
4. Uhl (100 MW) HPSEB HP Commissioned
5. Khauli (12 MW) HPSEB HP Commissioned
6. Rukti(1.5 MW) HPSEB HP Commissioned
7. Rampur(412MW) SJVN HP Commissioned

 PROJECTS IN PRIVATE SECTOR.( Since Oct-2008 till date)                  ANNEX.-II

S.No. Name of Hydel Project Department/Company Location State Current status.
1. Kurhed (4.5 MW) HIMACHAL HYDRO HP Commissioned
2. Tulang(3 MW) HIMACHAL HYDRO HP Successfully commissioned since July 2014
3. Kalheh(2.5 MW) VKG HP At NOCs stage
4. Shat(5 MW) SKB HP Various NOCs obtained except forest clearance which is under process and in final stage
5. Chharor(3 MW) SKB HP Various NOCs obtained except forest clearance which is under process and in final stage
6. Kurpan(4.8MW) HIMPRABHA HP Various NOCs obtained except forest clearance which is under process and in final stage
7. Kuril (5 MW) SAHU HPPL HP Survey / investigations, hydraulic studies, cost analysis, detailed structural designs and tender documentation for all Civil/ Mechanical/ Electrical works complete
8. Kurtha (5 MW) SAHU hPPL HP Successfully commissioned since October 2014
9. Chonned (15MW) PARVAT HPPL HP Survey and investigation works complete.
10. SJVNL (412 MW) SJVNL HP Consultancy for Structural design/ preparation of construction/fabrication drawing for 1 no. rope drum hoist and 1 no. portal gate for an opening of size 10.15m*10.15m at portal of spill tunnel for Rampur hydel project i/c its electrical arrangements complete.
11. Swad (5 MW) Micro Hydro Pvt. Ltd. HP At construction stage
12. Surah (1.5 MW) Micro Hydro Pvt. Ltd. HP At construction stage
13. Kanda (400 KW) M/S Bhagwati Power Projects. HP DPR prepared and submitted for TEC.
14. Kurpan Bagipul (1 MW) Micro Hydro Pvt. Ltd. HP Revised DPR prepared and submitted to TEC.
15. Baleni Ka Nallah(2 MW) Manimahesh Urja HP At DPR stage
16. Panchpula(0.5 MW) ERS HP At DPR stage
17. Shikari Mata (0.3MW) Shepmandi HP At DPR stage
18. Dev Kalakameshwar (0.15 MW) Shepmandi HP At DPR stage
19. Panjoud (0.5 MW) Shepmandi HP At DPR stage
20. Neri (5 MW) M/S ArchitButel HP At construction stage
21. Bharog (0.250 MW) M/S Ramu Ram HP At DPR stage
22. Megal (0.08 MW) M/S Ramu Ram HP At DPR stage
23.
NEW
Around 60 small hydel projects from 120 Kw to 10 Mw capacities
work have been awarded by Kargil Renewable Energy Development Agency ( KREDA), Distt. Kargil, Govt. of Jammu & Kashmir
Kargil Renewable Energy Development Agency (KREDA) J&K At present Survey work is in progress in Zanskar and Suru rivers at the elevations in between 3500 M to 4500 M in Distt. Kargil , J&K, to identify hydel projects up to 10 MW capacity by Survey team of KMN Engineering Consultants Pvt. Ltd. UP till 30 projects have already been identified and FRs for the same have been prepared & submitted to Ministry of New and Renewable Energy (MNRE).DPRs and tender documents are under preparation for all these projects.

Experience Certificates